Wednesday, October 22, 2003

Drilled the 4 mounting holes through the 3/4" frame for the pedal box. Marked and cut the edge off the pedal box. Marked the spot to drill out the hole for the master cylinder. Temporarily mounted the pedal box.

Drilled and placed cleco's in the top and front of the foot box. Temporarily placed a few other panels for future drilling. I think I'm gonna need those extra clecos.

Things I need:
  • 7/16" Drill Bit

  • Really buy the clecos


Updated Progress Pictures: